Project Manager: Mitch Field

Duration: July 2016 - September 2016

Project Overview:

The project on Airport Crossing Phase 2 valued at approximately $1.1 million required a base preparation for installation of Precast Pad over previous high pressure gas line and associated construction works. Within this project, North Star was responsible for installing the underground storm sewers and water pipes. The highlight of this project was the 200m stormtech storage tanks as shown in the picture. Other responsibilities that North Star took on, but was not limited to, was a 250m installation of sanitary pipe and 850m of storm pipe.

Challenges:

North Star faced challenges such as clearing out the site full of grey water and had to dig a retention basin to manage the stormwater.