About This Project

Project Manager: Mitch Field

Duration: September 2016 - September 2017

Project Overview:

Shawnessy Phase 1 surface was the development of a new road and access for mixed used commercial lots. North Star played a role as a subcontractor with the installation 3500sq.m of asphalt & gravel base, 1700m of curb, 30000sq.m of top soil spread in hydra seed, 500m of grass shale and 2700sq.m of paving between the intersections on Shawnessy Boulevard and Shawnessy place. Additionally, North Star was responsible for widening the lanes at the Shawnessy intersections.

Challenges:

The major challenges of taking on this project was controlling traffic around the Shawnessy area, construction planning for the intersections and late night pavings