GATEWAY AT THREE SISTERS

PROJECT OVERVIEW

The Gateway Project at Three Sisters Mountain Resort in Canmore was a full-scope development featuring a multi-lane roundabout at the main entrance. North Star successfully completed all surface work, including grading, paving, and concrete installations for new roadways, a shopping centre, office spaces, and parking lots. The team poured a 5,350m² concrete pathway, including a 2,550m² red pathway along Cascade Drive. Additionally, North Star completed all underground utility installations, including water and storm tie-ins, ensuring seamless integration for the site’s development.

PROJECT DETAILS

Watermains:

  • 200mm, 250mm: 1400lm

  • Directional drill up a steep slope

  • 6 hydrants

  • 2 pressure reducing chambers and valves

  • 29 valves 

Sanitary Sewers:

  • 150mm, 200mm, 250mm, 450mm: 1200lm

  • 450m x 200mm HDPE pressure main

  • Lift station excavation and tank installation and tie in 

  • 55.2 VM manhole Type 5A

Storm Sewers:

  • 375mm, 450mm, 600mm, 750mm, 900mm, 1050mm: 1065lm

  • 900mm concrete

  • 1350mm concrete 80lm

  • Storm pond control structure

  • 1350mm concrete outfall into pond

  • 900mm concrete outfall into pond

  • 29 x 5A manholes

  • 34 x 1 S manholes

  • 20 catch basins

  • 115lm catch basin leads 

  • 200lm subdrains

  • 10 oil grit separators

  • 3600m² class A rip rap

  • 9,750m² subgrade prep and base gravels and asphalt paving

  • 990lm curb and gutter

  • Concrete and asphalt aprons

  • Line paining

  • Traffic control

  • 2,550m² red concrete pathway

  • 5,350m² concrete pathway 