GATEWAY AT THREE SISTERS
PROJECT OVERVIEW
The Gateway Project at Three Sisters Mountain Resort in Canmore was a full-scope development featuring a multi-lane roundabout at the main entrance. North Star successfully completed all surface work, including grading, paving, and concrete installations for new roadways, a shopping centre, office spaces, and parking lots. The team poured a 5,350m² concrete pathway, including a 2,550m² red pathway along Cascade Drive. Additionally, North Star completed all underground utility installations, including water and storm tie-ins, ensuring seamless integration for the site’s development.
PROJECT DETAILS
Watermains:
200mm, 250mm: 1400lm
Directional drill up a steep slope
6 hydrants
2 pressure reducing chambers and valves
29 valves
Sanitary Sewers:
150mm, 200mm, 250mm, 450mm: 1200lm
450m x 200mm HDPE pressure main
Lift station excavation and tank installation and tie in
55.2 VM manhole Type 5A
Storm Sewers:
375mm, 450mm, 600mm, 750mm, 900mm, 1050mm: 1065lm
900mm concrete
1350mm concrete 80lm
Storm pond control structure
1350mm concrete outfall into pond
900mm concrete outfall into pond
29 x 5A manholes
34 x 1 S manholes
20 catch basins
115lm catch basin leads
200lm subdrains
10 oil grit separators
3600m² class A rip rap
9,750m² subgrade prep and base gravels and asphalt paving
990lm curb and gutter
Concrete and asphalt aprons
Line paining
Traffic control
2,550m² red concrete pathway
5,350m² concrete pathway