GATEWAY TURBO ROUNDABOUT

PROJECT OVERVIEW

The Three Sisters Mountain Resort Gateway Turbo-Roundabout project in Canmore involved the full-scope construction of a major Alberta transportation traffic circle. This multilane roundabout serves as a critical connection between Highway 1 and the residential and commercial roads leading into Three Sisters Mountain Resort. The project required extensive mobilization, traffic management, and the construction and removal of detours to maintain access throughout the construction process. Key aspects of the work included grading, paving, concrete flatwork, drainage infrastructure, and the installation of permanent traffic signage.

PROJECT DETAILS

  • 8,595m² of asphalt

  • 2,660m³ base course 

  • 3,473t asphalt pavement for carriage 

  • 894t 40mm asphalt top lift 

  • 8,595m² supply and application of tack

  • 70 decorative rundle rock boulders

  • 180m² rundle rock mulch in concrete slurry  

Landscaping maintenance:

  • Supply and install street trees

  • 12 Foothills Green Ash 

  • 32 White Spruce 

  • 82 Shrubby Cinquefoil

  • 68 Snowberries

  • Hydroseed slopes: 11,000m²  seeding

  • Topsoil replacement (450mm depth/700 tree pit): 350m³

  • Topsoil replacement (150mm depth seed areas): 1,650m³ 

  • 2,436lm concrete curb and gutter 

  • 1,915m² path/bike lanes/ sidewalk (3.5m, 2.3m, 1.8m)

  • 917m² concrete island capping 

  • 5 catch basins

  • 17 catch basin manholes

  • 1 storm manhole

  • 225 + 55 lm catch basin leads (250mm, 300mm) 

  • 91 lm x 1200mm culvert  

  • 1027m³ rip rap

  • Storm tank ST-36 modules

  • Electrical service kiosk 

  • All erosion and traffic control 

  • All permanent and temporary signage

  • All pavement painting and marking 