COSTCO TAZA EXCHANGE
PROJECT OVERVIEW
North Star successfully delivered the full scope of surface and underground work for the Taza Exchange Costco project in 2019–2020. This included comprehensive earthworks, grading, paving, and concrete work, along with interior building slab preparation. Our team also installed subdrainage systems, and catch basins, and completed all required electrical trenching, ensuring a seamless integration of infrastructure for this major commercial development.
PROJECT DETAILS
1350m² of sidewalks
2400m of 300mm curb and gutter
560m² of islands
1050m² of loading aprons
1865m of subdrains
2150m of shallow utilities
14,750m² of slab on grade prep
580m of footing excavation
38,279m² of subgrade prep
26,500t of 75mm crushed gravel
16,000t of 25mm crushed gravel
8000t of specialized Costco mix asphalt