COSTCO TAZA EXCHANGE

PROJECT OVERVIEW

North Star successfully delivered the full scope of surface and underground work for the Taza Exchange Costco project in 2019–2020. This included comprehensive earthworks, grading, paving, and concrete work, along with interior building slab preparation. Our team also installed subdrainage systems, and catch basins, and completed all required electrical trenching, ensuring a seamless integration of infrastructure for this major commercial development.

PROJECT DETAILS

  • 1350m² of sidewalks

  • 2400m of 300mm curb and gutter

  • 560m² of islands

  • 1050m² of loading aprons

  • 1865m of subdrains

  • 2150m of shallow utilities

  • 14,750m² of slab on grade prep

  • 580m of footing excavation

  • 38,279m² of subgrade prep

  • 26,500t of 75mm crushed gravel

  • 16,000t of 25mm crushed gravel

  • 8000t of specialized Costco mix asphalt