COSTCO LOGISTICS CENTRE
PROJECT OVERVIEW
This project included the installation of underground water, sanitary, and storm utilities to support both offsite and onsite servicing for the Costco Warehouse expansion in Ardrie. The scope also included the supply and installation of specialized infrastructure such as manholes, a Cultec stormwater system, a sand separator, and water valve chambers to support site servicing and stormwater management.
PROJECT DETAILS
The project included the installation of underground servicing and supporting infrastructure for the Costco Warehouse expansion. Key quantities completed as part of the scope include:
Installation of 436m of 750mm SDR35 pipe
Installation of 40m of 675mm SDR35 pipe
Installation of 708m of 600mm SDR35 pipe
Installation of 92m of 525mm SDR35 pipe
Installation of 264m of 450mm SDR35 pipe
Installation of 136m of 300mm SDR35 pipe
Installation of 936m of 250mm SDR35 pipe
Installation of 272m of 150mm SDR35 pipe
Installation of 17 hydrants
Installation of 579m of 400mm (16”) DR18 C905 PVC pipe
Installation of 713m of 500mm DR18 PVC pipe
Installation of 12.2m of 300mm DR18 pipe
Installation of 950.64m of 250mm DR18 pipe
Installation of 158.6m of 150mm DR18 pipe
Placement of 5,200t of 16mm drain rock
Placement of 8,145t of 40mm drain rock