RIVERCREST OFFSITE DEEP UTILITIES

PROJECT OVERVIEW

This project was an extension of Rivercrest Phase 2A, which involved connecting previously installed subdivision utilities to the existing infrastructure. It required the installation of large-diameter concrete pipes, which were connected to existing utility services at the bottom of a steep hill. The infrastructure upgrade was critical to supporting a new subdivision, requiring precise execution to seamlessly integrate the storm and sanitary systems.

PROJECT DETAILS

This project included installation of the following underground storm infrastructure, along with site preparation and rehabilitation works to support drainage and long-term site stability:

  • Installation of 560lm of large-diameter concrete pipe

  • Installation of 258lm of 200mm diameter PVC pipe

  • Installation of 62 reinforced concrete anchor blocks

  • Installation of 14 manholes

  • Placement of approximately 4,000t of drain rock

  • Stripping, clearing, and grubbing of approximately 5,500m²

  • Rehabilitation, including re-loaming, seeding, and hydro-mulching of approximately 5,500m²