EAST POINT BUSINESS PARK
PROJECT OVERVIEW
North Star Contracting self-performed the complete civil scope for this business park development. The work included installation of underground water, storm, and sanitary mains, manholes, subdrains, and shallow utilities. Surface works included grading, catch basins, concrete flatwork, bus pads, and paving to complete the site infrastructure. The project was delivered in collaboration with Jubilee Engineering in 2020.
PROJECT DETAILS
Underground Scope
1105m of storm lines
675m of sanitary lines
770m of water lines
23 manholes
1 oil & grit separator
100m of shallow utilities
1000m of subdrains
Concrete Scope
1120m of 1.6m mono walk
300m of 250mm curb and gutter
1500m of 500mm curb and gutter
1550m2 of median infill
110m2 of bus pads
1000m of crossing aprons
500m of 1m swale
11 catch basins
Paving & Grading Scope
9700m3 of common excavation
14,500m2 of subgrade prep
11,000t of 75mm crushed gravel
3200t of 25mm crushed gravel
4050t of A mix asphalt
1400t of C mix asphalt
700t of B mix asphalt