YYC GLOBAL PHASE 4

PROJECT OVERVIEW

This project involved the installation of deep utilities, grading, concrete work, and paving for a commercial warehouse development. Our team managed the full scope of underground utility installations, ensuring proper drainage and infrastructure support. Precise grading was conducted to establish a stable foundation, followed by high-quality concrete work to meet structural requirements. The final phase included asphalt paving to create durable and well-finished surfaces, ensuring functionality and long-term performance for the commercial facility.

PROJECT DETAILS

  • 1,300lm of storm main installations (pipe diameters ranging from 300mm to 900mm)

  • 300lm of building service installations (water, sanitary, and storm)

  • 32 manholes, 2 OGS units, and 1 Type K3 CB

  • 17,912m² of heavy-duty paving and 11,970m² of light-duty paving

  • 23,000t of 80mm gravel and 4,000t of 25mm gravel

  • 1,800m² of sidewalks, 440lm of barrier curbs, 1,200lm of pinned curbs, 744m² of dolly pads, and 9 driveway entrances

  • Survey and quality control coordinated by the general contractor