YYC GLOBAL PHASE 4
PROJECT OVERVIEW
This project involved the installation of deep utilities, grading, concrete work, and paving for a commercial warehouse development. Our team managed the full scope of underground utility installations, ensuring proper drainage and infrastructure support. Precise grading was conducted to establish a stable foundation, followed by high-quality concrete work to meet structural requirements. The final phase included asphalt paving to create durable and well-finished surfaces, ensuring functionality and long-term performance for the commercial facility.
PROJECT DETAILS
1,300lm of storm main installations (pipe diameters ranging from 300mm to 900mm)
300lm of building service installations (water, sanitary, and storm)
32 manholes, 2 OGS units, and 1 Type K3 CB
17,912m² of heavy-duty paving and 11,970m² of light-duty paving
23,000t of 80mm gravel and 4,000t of 25mm gravel
1,800m² of sidewalks, 440lm of barrier curbs, 1,200lm of pinned curbs, 744m² of dolly pads, and 9 driveway entrances
Survey and quality control coordinated by the general contractor