WEST SPRINGS PHASE 7

PROJECT OVERVIEW

North Star Contracting completed the full civil scope for West Springs Phase 7, a 59-lot residential subdivision in Calgary. The work included installation of underground water, sanitary, and storm sewer systems, along with critical tie-ins to existing mains and manholes. In addition to underground servicing, North Star carried out all necessary site grading to prepare the subdivision for future development. The project was delivered with precision and efficiency, reflecting North Star’s continued commitment to quality in residential infrastructure.

PROJECT DETAILS

  • Installation of 405lm of 200mm PVC pipe

  • Installation of 390lm of 200mm &150mm DR18 C900 PVC pipe

  • Installation of 400lm of 200mm & 450mm SDR35 PVC pipe

  • Installation of 27.5vm Type 5-A manholes

  • Tie-ins to existing mains & manholes

  • CCC & FAC video 

  • Installation of 59 main stops (25mm)

  • Installation of 59 curb stops (25mm)

  • Installation of 780lm of 25mm DR9 PEX pipe c/w plugs

  • Installation of 735lm of 75mm SDR28 PVC pipe c/w plugs

  • Installation of 715lm of 100mm SDR28 PVC pipe c/w plugs

  • Execution of 2 hot tap tie-ins to existing infrastructure

  • Removal & disposal of 450m³ via saw cutting

  • Stripping & export of 9,500m³ of topsoil

  • Stripping & export of 6,000m³ of brown dirt

  • Completion of 3,000m³ of common cut & fill

  • Import, placement, & compaction of 13,000m³ of fill material